Start of Bottleneck (0)
| Top 25 bottlenecks |
Bottleneck Lines (1)
| Top 25 bottlenecks |
Average Traffic Speeds (2)
| 0 -10 mph |
| 10 - 20 mph |
| 20 - 30 mph |
| 30 - 40 mph |
| 40 - 50 mph |
| 50 + mph |
2045 Congested Roads - Existing and Committed Projects (3)
2045 Congested Roads - Perferred Alternative (4)
2018 Travel Time Index (5)
| 0.0 - 1.1 (normal conditions/free flow) |
| 1.1 - 1.3 |
| 1.3 - 1.6 |
| 1.6 - 2.0 |
| 2.0 - 2.5 |
| 2.5 + (severe congestion) |
2018 Planning Time Index (6)
| 0 -1.3 (plan for less time) |
| 1.3 - 1.6 |
| 1.6 - 2.0 |
| 2.0 - 2.5 |
| 2.5 - 3.0 |
| 3.0 + (plan for more time) |
2018 Travel Time Reliability (7)
| Less than 1.0 (most reliable) |
| 1.0 -1.25 |
| 1.25 - 1.50 |
| 1.50 - 1.75 |
| 1.75 - 2.0 |
| 2.0 + (least reliable) |
2018 Interstate Traveltime Reliability (8)
| Less than 1.0 (most reliable) |
| 1.0 -1.25 |
| 1.25 - 1.50 |
| 1.50 - 1.75 |
| 1.75 - 2.0 |
| 2.0 + (least reliable) |
2018 Non-Interstate Travel Time Reliability (9)
| Less than 1.0 (most reliable) |
| 1.0 -1.25 |
| 1.25 - 1.50 |
| 1.50 - 1.75 |
| 1.75 - 2.0 |
| 2.0 + (least reliable) |
2018 Truck Travel Time Reliability (10)
| Less than 1.0 (most reliable) |
| 1.0 - 1.25 |
| 1.25 - 1.50 |
| 1.50 - 1.75 |
| 1.75 - 2.0 |
| 2.0 + (least reliable) |
MTA Planned Regional Transit Corridors (11)
Priority Letter Projects 2021 points (12)
Priority Letter Projects 2021 lines (13)
|